Servicing Mandurah & surrounds · Free measure & quote · Enquire online ·  Tap to call
Template to install · Mandurah & Peel

Your benchtop install, day by day

Accepted quote to finished bench is 2 to 3 weeks in Mandurah. Templating takes 45 to 90 minutes once the cabinets are in and level, fabrication runs 5 to 10 business days, and install day itself is 3 to 7 hours for a standard 4 to 5m² kitchen. You lose the kitchen sink for about 24 hours and nothing else. Everything below is what actually happens in between.

Most of the anxiety about a benchtop replacement is not about the stone, it is about the disruption: where the truck parks, how much dust ends up in the house, whether the dog can stay inside, and how many nights the family eats off the coffee table. Here is the honest version, stage by stage, with the timings we quote in the Peel and the things that stall a job. If you are still deciding on material or money, start with choosing a benchtop material or the budget guide.

Stage by stage timeline for a Mandurah kitchen

Timings are for a standard 4 to 5m² kitchen with an island. Add a day to fabrication and a few hours to install for two slabs, book matching or a full height splashback.

StageHow longWhat happensWhat you need to do
1. Free measure and quote 30 to 45 minutes on site, written quote within 1 business day Rough sizes, aspect, access, cut-outs and edge options discussed. The quote comes back itemised: slab, edges, cut-outs, removal, install. Have the appliance and sink details handy, and say if the cabinets are not built yet.
2. Slab selection and deposit Same week, 1 to 2 hours if you visit a slab yard Colour, finish and slab availability confirmed. A deposit is normal at this point, commonly 20 to 50 per cent, because the slab has to be purchased. Look at the full slab, not a 100mm sample. Veining varies enormously between slabs.
3. Cabinets fitted and levelled Your joiner, typically 1 to 3 days Carcasses fixed, packed and levelled. Nothing gets templated before this, because stone copies whatever it sits on. Book the joiner and the template a couple of days apart, not the same morning.
4. Digital template 45 to 90 minutes Laser or digital template of every run, wall shape, overhang and cut-out. Sink and cooktop are measured off the actual appliance, not a brochure. Have the sink, tap and cooktop on site. This is the last chance to change an overhang.
5. Fabrication 5 to 10 business days Slab cut, edges profiled, mitres glued, cut-outs polished, all wet cut with extraction in the workshop under the WA silica rules. Nothing. Use the time to sort the splashback decision if it is still open.
6. Old top removed 1 to 3 hours, install morning Plumber disconnects first, then the old top is broken out. Legacy engineered stone is controlled work: suppression, extraction, respiratory protection and WorkSafe WA notification. Empty the cupboards underneath and be out of the room while it comes out.
7. Install 3 to 7 hours Pieces carried in, dry fitted, levelled and packed, joins glued with colour matched epoxy, waterfall mitres closed, sink bonded, silicone tooled. Keep pets and children out of the carry path. Expect 15 to 30 minutes of real noise.
8. Plumbing and power back on Same day or next morning, 1 to 2 hours Licensed plumber reconnects the sink, waste and dishwasher. Any hardwired appliance is reconnected by a licensed electrician. Do not run water into an undermount sink for 24 hours.
9. Splashback and final check 2 to 4 hours, same day or a second visit Stone splashback fitted and siliconed, joins inspected in daylight, surface cleaned, care instructions and warranty paperwork handed over. Walk the bench with the installer before they leave and point at anything you are unsure about.

Typical timings for Mandurah, Halls Head, Greenfields, Dawesville, Falcon and Pinjarra jobs in 2026. Regional runs out past Pinjarra are grouped, so template and install dates may be set around a weekly route.

Prepare for the crew: printable checklist

Tick these off in the week before install. Your ticks are saved in this browser, and the print button gives you a clean copy for the fridge.

Two weeks out

The day before

Install morning

Before the crew leaves

Stop the job if you see these

Access, parking, power and water

Twenty millimetre stone weighs roughly 50kg per square metre, so a 3 metre by 600mm run is around 90kg and an island piece can be heavier again. It is carried on suction lifters by two to four people. That single fact drives most of the access questions. We need a vehicle and trailer within a reasonable carry of the door, a path clear of hose reels and bins, and gates that actually open wide. Older streets in Mandurah and Silver Sands often mean a verge park, canal homes at Port Mandurah and Wannanup often mean a long side path, and first floor units at Halls Head mean a stair carry that we need to know about at quoting time, not on the morning.

Power is one standard 10 amp point for a vacuum and a polisher. Water is an outside tap for wet trimming and clean up. Almost all cutting happens in the workshop, so on site work is limited to small adjustments, and every one of them is wet cut or done under on-tool extraction because that is the law, not a preference. If the property is vacant, tell us in advance so power and water are on.

Noise, dust, smell, pets and working from home

The loud part is short. Breaking out an old top is 15 to 30 minutes of genuine noise, and it is the worst of the day by a distance. After that it is drills, a vacuum, and occasional grinder work outside. Wet cutting produces slurry rather than airborne dust, which is why a compliant crew leaves your house cleaner than a tiling job does. The smells are mild and short lived: two part epoxy on the joins for about an hour, and acetic silicone with its vinegar smell for a day. Open a window and it clears.

Pets should be shut away at the other end of the house or out for the day, mostly because doors stay open and a 90kg slab being walked through a hallway is not the moment for a dog underfoot. Kids the same. If you work from home, plan to take calls elsewhere between about 8am and 11am, which covers the removal and the first fit. Most people go out for the noisy part and come back for the interesting part, which is watching the joins close up.

Want your install date locked in?

Send the room and your rough timing. We reply within one business day with a written quote and the template and install dates we can hold.

Weather, delays and what a clean finish looks like

Between June and August a Peel storm front can move a job. Slabs are carried on suction lifters and heavy rain or a strong gust makes that dangerous, so a wet winter morning is the most common reason an install slides a day. February heat above about 38 degrees changes the shape of the day rather than cancelling it: earlier start, faster silicone skin, more breaks. The other common stall has nothing to do with weather. It is cabinets that are not ready, a sink that has not arrived, or an appliance changed after templating, and it is why we ask for the real appliances on site before we measure.

A finished site should look like this. Offcuts and the old top gone, unless you have asked to keep a piece as a spare. Cupboards vacuumed out. No slurry on the paving, in a garden bed or down a stormwater drain, which matters in a City of Mandurah street where those drains run to the estuary. Silicone tooled in one continuous line rather than smeared. Joins that you have to hunt for from a low angle. Your old benchtop leaves with the crew and goes to a licensed waste facility, which is why removal and disposal is $150 to $400 on the quote, plus $200 to $600 if it is legacy engineered stone handled as controlled work.

What we do not do: plumbing and electrical work, because that has to be a licensed plumber and a licensed electrician in WA, and we would rather book them alongside us than pretend otherwise. We do not remove tiled splashbacks as a standard inclusion, and we will not template a kitchen where the cabinets are not level, because the fault would be baked into the stone. If we arrive and the room is not ready, we reschedule instead of pushing on, which is annoying on the day and a great deal less annoying than a benchtop with a wave in it.

Install day questions

How long does a benchtop installation take in Mandurah?
Install day itself is 3 to 7 hours for a standard 4 to 5 square metre kitchen, and about 2 hours for a laundry top or a pair of vanities. The whole process from accepted quote to finished bench is normally 2 to 3 weeks, because fabrication takes 5 to 10 business days after the template. A kitchen with two slabs, a waterfall island and a full height splashback can run into a second day.
How long am I without a kitchen sink?
Usually 24 hours. The plumber disconnects the sink before the old top comes off, and reconnects it once the new top is in and the silicone has had time to skin. We ask you not to run water into an undermount sink for 24 hours after install so the bond and the silicone cure properly. Plan one night of takeaway or paper plates and you will be fine.
How much noise and dust does a stone benchtop install make?
Less than people expect, because almost all cutting is done in the workshop. Expect 15 to 30 minutes of genuinely loud work while the old top is broken out, plus short bursts of a wet grinder outside for on-site trimming. All silica cutting is wet or under on-tool extraction, which is a legal requirement, so there is no dry dust cloud through the house. The acetic silicone has a vinegar smell that clears within a day.
What do I need to move before the crew arrives?
Clear everything off the benchtops, empty the base cupboards directly under them, and leave a clear path at least 1 metre wide from the front door or the side gate to the kitchen. Move cars out of the driveway before 7am, because a 3 metre slab is carried by two to four people and weighs roughly 50kg per square metre. Take pictures off the walls along the carry path.
Can weather delay a benchtop install in Mandurah?
Yes, and it does most often between June and August. Slabs are carried on suction lifters and a heavy rain squall or a strong sea breeze makes that genuinely dangerous, so a wet winter morning can push a job by a day. Extreme heat matters too: above about 38 degrees the crew starts earlier and silicone skins faster, which changes the sequence rather than the outcome.
What happens to my old benchtop?
It leaves with us and goes to a licensed waste facility, which is why removal and disposal is a $150 to $400 line on the quote rather than a freebie. Western Australia charges a landfill levy on waste in the levy area, which covers the metropolitan region and the City of Mandurah. If the old top is legacy engineered stone it is handled as controlled work with dust suppression and WorkSafe WA notification, and that adds $200 to $600.

Next: what the warranty covers once the crew leaves, how to look after the new stone, and how much stone your kitchen needs.

Get a price

Book a template date for your kitchen

Send your suburb and when the cabinets will be in, and we reply within one business day with a written quote and the next available template and install dates.

We reply within 1 business day. Free, no obligation.

One day of noise, twenty years of bench

Free measure, digital template, compliant wet cut fabrication, clean install across Mandurah and the Peel.

 Tap to call